KOREAN | ENGLISH
Mirae Hightech
  • COMPANY
    • Company Profile
    • History
    • Certification
    • Location
  • PRODUCTS
    • Dock Arm
    • Fishing Boat Winch
    • Towing Carriage System
    • Wave Generating System
    • Current Generating System
    • False Bottom System
    • Wave Absorber System
    • Cavitation Tunnel
  • INQUIRY
  • CUSTOMER CENTER
    • Data
    • Q & A
    • News & Notice

Dock Arm

Home Dock Arm
Specification

  • Dock Arm Capacity : 400kg at 20~40*m (changeable)
  • Safety working load(SWL) : 400kg
  • Travelling speed : 0~25m/min
  • Slewing speed : 0~15m/min at basket
  • Slewing angle : 180° limited
  • Over load : over the 500kg at basket
  • Electric source : AC415V, 50Hz
  • Hydraulic pressure(working) : abt. 230kg/㎠

 Gallery

PRODUCTS

  • Dock Arm
  • Fishing Boat Winch
  • Towing Carriage System
  • Wave Generating System
  • Current Generating System
  • False Bottom System
  • Wave Absorber System
  • Cavitation Tunnel
595-4, Hwajeon-dong, Gangseo-gu, Busan, Korea | Direct : +82 51 601 7293 | Fax : +82 51 831 2133 | Email : mirae@miraeht.co.kr
COPYRIGHT MIRAE HITECH CO.,LTD. ALL RIGHTS RESERVED.